> No hot work for installing the COVERFLOTE itself
> No need to cut the shell for a temporary opening
> All COVERFLOTE’s components can be introduced through a 24’’ manhole
> No need of crane as the components are very light
> Necessary electrical power is few (light, drilling, saw)
> Quick installation : reduced immobilisation of the tanks
> No need to proceed to tightness test and to hydraulic tests (saving of time and money to avoid to pump water and to clean after emptying)
> Possible installation after water test of the tank and painting
> Can be fitted to the geometrical particularity of the tank shell (verticality)
> Possible installation by local workers, with possible assistance of one of LARCO's Supervisors.